- 商品参数
-
- 作者:
李树森 等著|
郎毅 等译
- 出版社:黄河水利出版社
- 出版时间:2019-11-01 00:00:00
- 版次:1
- 印次:1
- 印刷时间:2019-11-01
- 字数:432000
- 页数:218
- 开本:16开
- 装帧:平装
- ISBN:9787550925618
- 国别/地区:中国
- 版权提供:黄河水利出版社
Xiaolangdi water conservancy project of the Yellow River is located in Xiaolangdi,Mengjin county,Luoyang city,Henan province,at the exit of the last Canyon in the middle reaches of the Yellow River to the north of Luoyang city,40 km away from Luoyang city in the south.Xiaolangdi Reservoir of the Yellow River is located in the lower part of the middle reaches of the Yellow River,130 km away from Sanmenxia water conservancy project on the top and 128 km away from Huayuankou,Zhengzhou,Henan Province on the bottom.
Xiaolangdi Reservoir of the Yellow River is a large-scale comprehensive water conservancy project on the main stream of the Yellow River,which integrates sediment reduction,flood control,ice prevention,water supply and irrigation,power generation,storage,clearing and discharge
...