由于此商品库存有限,请在下单后15分钟之内支付完成,手慢无哦!
100%刮中券,最高50元无敌券,券有效期7天
活动自2017年6月2日上线,敬请关注云钻刮券活动规则更新。
如活动受政府机关指令需要停止举办的,或活动遭受严重网络攻击需暂停举办的,或者系统故障导致的其它意外问题,苏宁无需为此承担赔偿或者进行补偿。
正版新书]油气管道设计与建设康勇9787563629503
¥ ×1
Chapter 1 PIPELINE INTRODUCTION
1.1 PIPELINE DEVELOPMENT
1.1.1 International Pipeline Development
1.1.2 Development of China pipeline Industry
1.1.3 Considerations of Pipeline Transportation
1.2 PIPELINE SYSTEM
1.2.1 Types of Pipelines
1.2.2 Pipeline Network
1.2.3 Gas Pipeline Network in the City
Chapter 2 PIPELINE GEOTECHNICS DESIGN
2.1 ELEMENTS INFLUENCING PIPELINE DESIGN
2.1.1 Codes and Standards
2.1.2 The General Procedures of Pipeline Design
2.1.3 Supply, Demand and Route Selection
2.1.4 Environmental Considerations
2.1.5 Effect of Hydraulic Fluids
2.1.6 Economics
2.1.7 Material and Construction
2.1.8 Pipeline Protection
2.2 ROUTE SDRVERY AND GEOTECHNICAL DESIGN
2.2.1 Preliminary Route Selection
2.2.2 Engineering Survey
2.2.3 Legal Survey
2.2.4 Construction/As Built Survey
2.3 GEOTECHNOLOGY OF PIPELINE CONSTRUCTION
2.3.1 Guidelines of Pipeline Route Selection
2.3.2 Slope Stability Control
2.3.3 Drainage and Erosion Control
2.4 ANCHORING AND SUPPORT
2.4.1 No Anchor Supporting
2.4.2 Anchor Supporting
2.5 PIPELINE ENGINEERING SURVEY
2.5.1 Surveying Equipment
2.5.2 Pipeline Layout Survey
2.6 PIPELINE CONSTRUCTION IN FROZEN AREAS
2.6.1 The Pipeline Design Issues
2.6.2 Pipeline Construction Technology
Chapter 3 PIPELINE MECHANICAL DESIGN
3.1 THEORIES OF STRENGTH
3.1.1 Normal Stress
3.1.2 Component of Shear Stress
3.1.3 Principal Stresses
3.1.4 Allowable Stress
3.1.5 Theories of Failure
3.2 MEMBRANE STRESSES IN VESSELS UNDER. INTERNAL PRESSURE
3.2. 1 Analysis of Membrane Stresses
3.2.2 Cylindrical Vessel under Internal Pressure
3.3 PROCEDURES OF PIPELINE DESIGN
3.3.1 Considerations of Pipeline Design
3.3.2 Method of Calculation
3.4 VALVE ASSEMBLIES
3.4.1 Block Valves
3.4.2 Compressor Station Tie-ins
3.4.3 Valve Operators
3.4.4 Blowdowns
3.4.5 Vent Operators
3.5 MATERIALS SELECTION
3.5.1 Material and Specification Requirements
3.5.2 Fracture Control Design
3.5.3 Strength Requirements
3.5.4 Chemical Composition
3.5.5 Dimensional Tolerances
3.6 QUALITY MANAGEMENT
3.6.1 Quality and Requirement
3.6.2 A Quality Project
Chapter 4 TRANSMISSION PROCESSES DESIGN
4.1 GENERAL DESIGN PARAMETERS
4.1.1 Forecasting Throughput
4.1.2 Basic Parameters
4.1.3 Physical Characteristics of Mediums
4.1.4 Developing Design Alternatives
4.1.5 Natural Gas Hydraulics
4.2 PRINCIPLES OF FLOW
4.2.1 Ideal Gas Law
4.2.2 Real Gas Law
4.2.3 The Law of Conservation ,
4.2.4 Heat Transmission
4.2.5 Friction Factor and Flow Regimes
4.3 GENERAL FLOW EQUATIONS
4.3. I Darcys Formula
4.3.2 Flow of Gas in Pipe Lines
4.3.3 Other Flow Equations
4.3.4 Compressor Calculations
4.4 ECONOMIC CONSIDERATIONS
4.4.1 The Optimization Process
4.4.2 Detailed Cost of Service Analysis
4.4.3 J-curve Example
Chapter 5 PIPELINE CONSTRUCTION
5.1 GENERAL CONSTRUCTION PROCESSES
5.1.1 Clearing the Right-of-way
5.1.2 Right-of-way Grading
5.1.3 Ditching and Trenching
5.1.4 Pipe-settled Ditching
5.1.5 Pipe Hauling and Stringing
5.1.6 Pipe Bending
5.1.7 Welding
5.1.8 Pipeline Inspection
5.1.9 Non-destructive Testing
5.1.10 Pipe Painting and Coating
5.1.11 As-built burvey
5.1.12 Lower-in
5.1.13 Backfill
5.1.14 Tie-ins
5.1.15 Ciosgings
5.1.16 Fabrication
5.1.17 Cathodic Protection
5.1.18 Erosion Control and Revegetation
5.1.19 Cleanup and Restoration
5.2 HYDROSTATIC TESTING
5.2.1 The Considerations of Tested Sections
5.2.2 Internal Cleaning and Ingpection
5.3 COMMISSIONING
5.3.1 Natural Gas Pipelines
5.3.2 Liquid Petroleum Gas Pipelines
Chapter 6 CROSSING AND OFFSHORE PIPELINE CONSTRUCTION
6.1 INTRODUCTION
6.1.1 Buoyant Control of Crossing
6.1.2 Buoyancy Control Systems Design
6.2 OPENING RIVER CROSSING
6.2.1 Construction Plan
6.2.2 Construction Technical Measurements
6.2.3 HSEManagement System
6.2.4 Main Materials and Machines for River Crossing
6.3 CROSSING BY DRILLING
6.3.1 Processes of Drilling
6.3.2 Roads and Railroads Crossing Design
6.4 PIPE DRIVING CROSSING CONSTRUCTION
6.4.1 Shield Construction
6.4.2 Pipe Driving Crossing C6nstrudtion
6.5 OFFSHORE PIPELINE CONSTRUCTION
6.5.1 Introduction to Offshore Pipeline Construction
6.5.2 Reference Documents
6.5.3 Offshore Pipeline Design
6.5.4 Methods of the Pipelay
6.6 PIPELINE OVERHEAD CROSSING
6.6.1 Overhead Crossing Design
6.6.2 Introduction to Overhead Crossing
6.6.3 Future Development of Pipe Overhead Crossing
Chapter 7 PIPELINE ENGINEERING MANAGEMENT
7. I PIPE MANUFACTURING PROCESS
7.1.1 Types of Pipe Welding
7.1.2 Pipeline Perspectives for the Future
7.1.3 Technological Process of Pipe Manufacturing
7.2 IMPROVED COATINGS
7.2.1 Coating Properties for Operation
7.2.2 Internal and External Pipe Painting System
7.2.3 Coating Materials Choice
7.3 CATHODIC PROTECTION
7.3.1 Methods to Apply Cathodic Protection
7.3.2 Cathodic Protection Design
7.4 PIPELINE PIGGINGS
7.4.1 Explanation of Pigging
7.4.2 Codes and Standards
7.4.3 Major Components of Pigging Assembly
7.4.4 Pig Barrel and End Closure
7.4.5 Pig Barrel Valves
7.4.6 General Procedures for Pig Launch and Receive
7.5 PIPELINE LEAKS FINDING AND REPAIRING
7.5.1 Leak Condition and Calculation
7.5.2 Repairing Damaged Pipelines
7.5.3 Non-stop Service Hot-tapping and Plugging on Pipe
7.6 OHSE OPERATION GUIDE
7.6.1 QHSE Management Functions
7.6.2 Capacity Evaluation
7.6.3 Training
7.6.4 Equipments Evaluation and Information Exchange
7.6.5 Documents and Controls
7.6.6 QHSE Risks Identification and Evaluation
7.7 SCADA SYSTEM
7.7.1 A Brief SCADA Review
7.7.2 SCADA Elements
7.7.3 Secured SCADA System
ENGLISH-CHINESE GLOSSARY
REFERENCES
亲,大宗购物请点击企业用户渠道>小苏的服务会更贴心!
亲,很抱歉,您购买的宝贝销售异常火爆让小苏措手不及,请稍后再试~
非常抱歉,您前期未参加预订活动,
无法支付尾款哦!
抱歉,您暂无任性付资格