Part one Preliminary Works(前期工程)
Unit l Project Synopsis(工程简介)
Unit 2 Construction Method Statement(施工方案会审)
Unit 3 Tender Document and Contracts(标书与合同)
Unit 4 Access to the Site(进场)
Part two Construction of Main Frame(主体结构施工)
Unit 5 Construction of Underground Works(基础工程施工)
Unit 6 Formwork(模板工程)
Unit 7 Reinforcement Works(钢筋工程)
Unit 8 Concrete Works(混凝土工程
Unit 9 Inspection of Safety(安全检查)
Unit 10 Quality Control(质量控制)
Unit 11 Roofing Works(屋面工程
Part three Final-stage Works(后期工程)
Unit 12 Apparatus Works(设备工程)
Unit 13 Ornamental (Decoration) Works(装饰工程)
……