由于此商品库存有限,请在下单后15分钟之内支付完成,手慢无哦!
100%刮中券,最高50元无敌券,券有效期7天
活动自2017年6月2日上线,敬请关注云钻刮券活动规则更新。
如活动受政府机关指令需要停止举办的,或活动遭受严重网络攻击需暂停举办的,或者系统故障导致的其它意外问题,苏宁无需为此承担赔偿或者进行补偿。
正版 石油钻井技术 高长虹 科学出版社 9787030537607 书籍
¥ ×1
Preface
Chapter 1 Drilling systems
1.1 Hoisting system
1.1.1 Draw-works and wire rope
1.1.2 Crown block and traveling block
1.2 Rotary system
1.2.1 Kelly and kelly bushing
1.2.2 Swivel
1.2.3 Drill pipe and drill collar
1.2.4 Drill bits
1.2.5 Other accessories on drill string
1.3 Mud circulation system
1.4 Solid control equipment
1.4.1 Shale shaker
1.4.2 Desander and desilter
1.5 Well control equipment
1.6 Efficiency of hoisting system
1.7 Top drive system
Chapter 2 Drilling mud
2.1 Types of drilling fluid
2.1.1 Water-based mud (WBM)
2.1.2 Oil-based mud (OBM)
2.1.3 Synthetic-based mud (SBM)
2.2 Mud density calculations
2.3 Basics of Newtonian and non-Newtonian fluid
2.4 Laminar flow of Bingham plastic fluid in pipe
2.5 Laminar flow of Bingham plastic fluid in annulus
2.6 Turbulent flow of mud in annulus
2.7 Flow through nozzles
2.8 Mud measurements
2.8.1 Mud density
2.8.2 Mud viscosity
2.8.3 Mud filtrate loss
2.8.4 Other measurements
Chapter 3 Casing design
3.1 Overburden stress
3.2 Pore pressure
3.3 Fracture pressure
3.4 Introduction to casing
3.5 Casing setting depth
3.6 Casing size selection
3.7 Casing grades selection
Chapter 4 Directional drilling
4.1 Reasons for drilling directional wells
4.2 Geometry of directional well
4.3 Deflection tools
4.4 Trajectory design
Chapter 5 Mud hydraulics
5.1 Flow rate capacity requirement
5.2 Pressure requirement
5.3 Mud hydraulics optimization
5.3.1 Maximum bit horsepower criterion
5.3.2 Maximum jet impact force criterion
5.3.3 Maximum nozzle velocity criterion
5.4 Discussions
Chapter 6 Underbalanced drilling
6.1 Benefits ofunderbalanced drilling
6.2 How to achieve underbalanced condition
6.3 Underbalanced drilling operations
6.4 Surface equipment for underbalanced drilling
Chapter 7 Cementing and perforation
7.1 Functions of cement
7.2 Selection of cement grades
7.3 Preparing the cement
7.4 Cementing the well
7.5 Well perforation
Chapter 8 Drilling problems and drilling costs
8.1 Stuck pipe
8.2 Shale sloughing
8.3 Lost circulation
8.4 Well kick
8.5 Drilling costs
8.5.1 Leases
8.5.2 Site preparation
8.5.3 Well drilling
8.5.4 Rig mobilization
8.5.5 Miscellaneous costs
Chapter 9 Properties of hydrocarbon and rock
9.1 Phase behavior
9.1.1 Oil reservoir
9.1.2 Gas reservoir
9.2 Properties of natural gas
9.2.1 Ideal gas law
9.2.2 Properties of real gas
9.2.3 Compressibility of gas
9.2.4 Gas formation volume factor
9.2.5 Gas viscosity
9.3 Properties of crude oil
9.3.1 Oil specific gravity
9.3.2 API gravity
9.3.3 Solution gas oil ratio
9.3.4 Oil formation volume factor
9.3.5 Oil viscosity
9.4 Basic rock properties
9.4.1 Porosity
9.4.2 Permeability
9.4.3 Electrical conductivity and resistivity
Main References
Appendix A
Appendix B
Appendix C
Appendix D
Changhong Gao received his degrees in petroleum engineering from China University of Petroleum, University of Tulsa and Curtin University. He worked for Sinopec as a field engineer and research engineer. He also taught at United Arab Emirates University, University of Aberdeen and Petroleum Institute of Abu Dhabi.
In 2013, he was elected Taishan Scholar by Shandong province government, as well as Yellow River Delta Scholar by Dongying city government. His teaching and research interests include drilling mud, production system design and enhanced oil recovery. He has published more than 30 journal papers and presented a few papers at SPE and APPEA conferences.
评论
从事石油钻井工作的技术人员大学院校学生从事石油钻井工作的技术人员大学院校学生本书从旋转钻井系统和顶部钻井系统出发,进而阐述钻头工作原理,钻井液的功能和压降计算方法,套管设计方法,水平井技术,钻井技术难题等重点内容。不仅覆盖了传统钻井作业的所有重点技术,同时也包括了钻井技术的新进展,如顶部驱动技术和旋转导向技术。从钻井设备出发,循序渐进讲述了完整的钻井过程。
导语_点评_词
亲,大宗购物请点击企业用户渠道>小苏的服务会更贴心!
亲,很抱歉,您购买的宝贝销售异常火爆让小苏措手不及,请稍后再试~
非常抱歉,您前期未参加预订活动,
无法支付尾款哦!
抱歉,您暂无任性付资格